man in blue with helmet

Is it really possible to improve superlatives? - Absolutely, with positive displacement blowers from AERZEN! The new generation Delta Blower G5plus is on the market!

04/04/2017

AERZEN set standards with the Delta Blower positive displacement blowers and raised the bar ever higher for performance, economic efficiency and environmental protection. To expand upon the success of the blower series, an exciting new design sets energy saving records. The innovative assembly concept combines proven features and newly-gained advantages. Delta Blower G5plus achieves up to 5% more energy efficiency and offers more flexibility to meet even special requirements.

AERZEN Delta Blowers Generation 5 are positive displacement blowers for almost any application and have already convinced many users by their robustness and long-life cycle. Especially, their performance data are impressive. They reach intake volume flows of 30 to 15,000 m3/h at a control range of 25 to 100 % and overpressures of up to 1,000 mbar. The Delta Blowers convince in many industries, for example during water and wastewater treatment, aeration, filter backwash, pneumatic conveyance, gas conveyance, degassing or dedusting.

AERZEN has developed the successful concept with the new Delta Blower G5plus and raised it to the next technological level. Apart from the known advantages of the series, it is the new compact design that attracts attention. It allows a space saving side-by-side installation and requires less space in the machine room.  All blowers achieve oil-free operation class 0 as per ISO 8573-1 according to the AERZEN Environmental Concept. They are free of absorption material up to 100 % and require oil change only after 16,000 operating hours.  Energy-efficient motors class IE3 are used as standard and suction is still at the cold side of the assembly.

What is absolutely new with the Delta Blower G5plus is up to five per cent energy saving by means of an optimised intake filter silencer with lowest flow losses, high-efficient electrically driven fans and an optimised standard base support which makes reduced pressure losses possible. The warm exhaust air is routed over the roof of the acoustic hood to connect a separate channel for optional heat recovery. But the “plus” also refers to the additional comfort of Delta Blower G5plus: The new acoustic hood concept reduces the installation surface area by up to 10 % depending on the size and the acoustic hood door makes easier and faster access possible to facilitate the maintenance of the assembly. The multifunctional, extended base support creates a plus of flexibility by an integrated spark arrester (ATEX), the preparation for installation of a start unloading device, components for installation of third-party motors and a patented reactive silencer.

AERZEN supplies the technically optimised and conceptionally enhanced Delta Blower G5plus positive displacement blower in four sizes for volume flows of 440 m³/h up to maximum 3,600 m3/h.


more releases

- Performance³ - The next generation.

Biological activation accounts for up to 80% of a wastewater treatment plant’s total energy requirements. Aerzener Maschinenfabrik has set itself the task of discovering hidden energy potentials in aeration to improve its efficiency and optimise it: Performance³ is a tailor-made machine...

čtěte dále
Product expansion for Delta Blower positive displacement blowers

- Product expansion for Delta Blower positive displacement blowers

Aerzener Maschinenfabrik’s extensive assembly series has been expanded to cover intake volume flows of 6600 m3/h and 7800 m3/h. This enables AERZEN, one of the world market leaders in blower technology, to offer its customers even more finely graded blower sizes. Individual requirements for process...

čtěte dále
AERZEN Service network. Perfectly connected throughout Germany.

- AERZEN Service network. Perfectly connected throughout Germany.

Perfect machine availability also has to do with short distances. Therefore AERZEN is continuously expanding its service network. The  new service centres in Mönchengladbach, Essen and Trier recently started their work in order to be on site quickly and provide competent help.

čtěte dále